Categories: Data Center
Shackelford County, Texas, USA
Vantage Data Centers
Strategic Program:
Stargate hyperscale infrastructure in partnership with OpenAI and Oracle
Main Contractor:
Kiewit
Lead Engineering Partner:
Thompson Engineering
Project Value:
USD 25 billion
Campus Scale:
1200 acres, 10 data centers, about 3.7 million square feet
Planned IT and Power Capacity:
1.4 gigawatts total campus capacity, ultra high density racks 250 kW plus
Cooling Concept:
Liquid cooling and closed loop chiller system with low water use
Project Status:
2025 ongoing
MEP systems verification and quality control across electrical, mechanical, and life safety packages
Testing and commissioning management, including readiness reviews, functional testing oversight, and compliance reporting
Civil works verification and quality control, ensuring alignment with design requirements and construction standards
Frontier is Vantage Data Centers flagship mega campus in Texas, developed to respond to rapidly growing high-performance computing and cloud demand. With 1.4 GW planned capacity and ten hyperscale buildings, Frontier is one of the largest data center developments currently underway in the United States.
CSI Engineering is engaged as the MEP verification and commissioning partner on a fast track delivery model. Our team confirms installation quality, system completeness, and performance against project specifications, while driving structured testing and commissioning to protect schedule and operational reliability.
Parallel civil verification is delivered by CITEX, enabling unified quality coverage from foundations and structures through to full MEP system handover.
The project is being executed at high speed with multiple buildings and utility phases progressing in parallel. CSI Engineering supports the client and contractors with disciplined field inspections, issue closure tracking, and commissioning governance to ensure each phase is delivered safely, consistently, and ready for critical load operations.